Endevion S.r.l. Cooling Tower Performance Test
Place
La Réunion
Data
04-2024
Application
Testing Engineer
Type of project
Cooling tower performance test (CTI-ATC-105 performance curves method)
The purpose of this analysis is to describe the method and the activity carried out in
order to calculate the performance of the cooling tower located in Albioma Power Plant.
METHOD OF MEASUREMENT
Calculations and the methods of measurement object of this report are in accordance with
the CTI-ATC-105 code.
CONDITIONS OF THE PLANT
The thermodynamic test has been made on April 5th 2024.
The cooling tower was composed by 4 cells in line and during the test
cells were running and no one was in shut down.
During the test day the sky wasn’t cloudy and without strong wind.
The capability of the cooling tower cells has been checked in one stable period with a
duration of one hour.
In the period chosen for the thermodynamic test, the stability of the parameters was within
the limits provided by the CTI-ATC-105 code.